WQ Infrastructure Repair (32)
| Immediate |
| 6-12 Months |
| 1-2 Years |
Lakes (1)
Storm Basin (2)
Wetlands (3)
Basin Contours (30)
Non-Pond Drainage Basin (31)
WQ Major Drainage Basin (4)
WQ Drainage Basin (5)
Small Sub-Basins (6)
Large Sub-Basins (7)
Non-Pond Stormwater BMPs (8)
Bald Lake (15)
Blackhawk Lake (16)
Bur Oaks Pond (17)
Carlson Lake (18)
Fish Lake (19)
Hay Lake (20)
Heine Pond (21)
Holland Lake (22)
Holz Lake (23)
LeMay Lake (24)
McDonough Lake (25)
North Lake (26)
Schwanz Lake (27)
Thomas Lake (28)
Public Watercourses (36)
| Public Water Watercourse |
| Public Ditch/Altered Natural Watercourse |
Public Waters Basins (37)
Public Water Basins with DNR Shoreland Class (39)
| General Development |
| Recreational Development; Recreational Development/General Development |
| Natural Environment |
| No DNR Shoreland Class assigned |
Fishing Pier (42)
| Fishing Pier |
|